Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco BuildersCall

What we build · Functional & Turf

Sleds, Ropes and Ceiling Height

Turf lanes, rigs, sleds and open training space. The zone most constrained by ceiling height.

Before you sign. Tell us the programming and we will tell you whether the space can carry it.

Impact

A dropped weight is a load event, not a static one

Structure

Noise travels through the slab, not around it

Pre-lease

We will look at a space before you sign it

Licensed

General contractor, licensed in the state of Florida

Ceiling height is discovered late

Rope climbs, overhead pressing, rigs with pull-up stations and box jumps all need real height, and a tenancy with a low structural soffit or heavy services below it cannot accommodate them. That is a measurement anybody can take before signing, and it is routinely taken afterwards.

What the zone needs

  • Clear height to the underside of services, not to the deck.
  • Rig anchoring, which imposes loads on structure or slab.
  • Turf installed over a surface that suits sled work.
  • Impact-resistant walls where things get thrown.
  • Ventilation, because this zone works hardest.

How we handle it

  1. 01Measure clear height to the underside of services.
  2. 02Anchor rigs to an engineer's detail.
  3. 03Install turf over an appropriate substrate for sleds.
  4. 04Protect walls where impact is expected.
  5. 05Locate the zone where its noise is least disruptive.

Measure to the underside of the ducts, not to the structure. Clear height is what the equipment actually has, and services running below a soffit routinely take a foot or more out of a space that looked adequate on a drawing.

Said plainly

Where we stop

Where ceiling height will not support the programming, the programming changes rather than the building. We will say so before the lease rather than after the rig is ordered.

FAQ

Common questions

How much ceiling height do we need?
It depends on the programming. Measure to the underside of services, not the deck.
Do rigs need engineering?
Anchoring imposes real loads. It is an engineered detail.
Does turf need a special substrate?
For sled work, yes. It affects both the sled and the turf life.
What if height is inadequate?
The programming changes. Better known before the lease.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.