What the space decides · The Lease

What the Landlord Actually Delivers

The work letter describes what the landlord provides, and that description is where most gym budget surprises originate.

Before you sign. Tell us the programming and we will tell you whether the space can carry it.

Impact

A dropped weight is a load event, not a static one

Structure

Noise travels through the slab, not around it

Pre-lease

We will look at a space before you sign it

Licensed

General contractor, licensed in the state of Florida

The allowance does not cover a gym

A tenant improvement allowance calculated on a standard commercial fit-out does not cover a gym's structural isolation, mechanical upgrade, shower waterproofing and drainage. The gap is the tenant's, and it is far larger than most operators expect from a space that looked like a good deal.

What to pin down before signing

  • What the allowance actually covers, and what it excludes.
  • Existing mechanical and electrical capacity, in figures.
  • Whether drainage exists for showers, and where.
  • What anchoring into the structure is permitted.
  • Noise, nuisance and hours provisions.

How we handle it

  1. 01Review the work letter with you before signing.
  2. 02Walk the space and verify what is actually there.
  3. 03Price the gap between the allowance and a working gym.
  4. 04Give you that number while it is still negotiable.

Have somebody walk the space and read the work letter at the same time. Verifying what is physically present against what is promised takes an afternoon and it is the highest-return hour in a gym project.

Said plainly

Where we stop

After signing, every gap is the operator's cost. We can price it accurately and we cannot move it, which is why the walk happens first.

FAQ

Common questions

Does a standard allowance cover a gym?
Rarely. Isolation, mechanical, drainage and waterproofing are all beyond a standard fit-out.
What should we verify?
Mechanical and electrical capacity in figures, and whether shower drainage exists.
Is anchoring always permitted?
Not always. Check what the lease allows before designing rigs.
When should we get advice?
Before signing. Afterwards every gap is yours.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.