What we build · Cardio & Machines

Power, Air and Sight Lines

The largest floor area and the least structurally demanding, with its own power and cooling requirements.

Before you sign. Tell us the programming and we will tell you whether the space can carry it.

Impact

A dropped weight is a load event, not a static one

Structure

Noise travels through the slab, not around it

Pre-lease

We will look at a space before you sign it

Licensed

General contractor, licensed in the state of Florida

Cooling is underestimated every time

A room full of people exercising generates a great deal of heat and moisture, and in Florida that is on top of an already substantial cooling load. Mechanical systems sized on ordinary occupancy figures leave a gym that is uncomfortable at peak, which is exactly when members are judging it.

What drives it

  • Cooling load from occupancy, which is far above office figures.
  • Ventilation, which controls both temperature and smell.
  • Power and data at every cardio position.
  • Floor outlets or feeds, so cables do not cross walkways.
  • Sight lines to screens and to the rest of the floor.

How we handle it

  1. 01Size cooling for peak occupancy, not for average.
  2. 02Provide ventilation adequate for the actual use.
  3. 03Feed cardio positions properly, not from wall outlets.
  4. 04Lay out for sight lines and circulation.
  5. 05Coordinate equipment layout before electrical rough-in.

Size the mechanical for peak, not average, occupancy. A gym at six o'clock on a January evening is the moment members form their opinion of it, and a system sized on an averaged figure is uncomfortable at exactly that hour.

Said plainly

Where we stop

If the existing mechanical capacity will not support gym occupancy, that is a landlord conversation before signing. Adding capacity afterwards is the tenant's cost.

FAQ

Common questions

Why is cooling underestimated?
Gym occupancy generates far more heat and moisture than office figures assume.
Should cooling be sized for peak?
Yes. Peak is when members judge the facility.
How should cardio be fed?
Floor outlets or dedicated feeds, so cables do not cross walkways.
What if the base building cannot cope?
That is a landlord conversation before signing.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.